Skip to content

São Paulo Manufacturing Analytics Strategy

Difficulty: Medium20 minutesInformation Technology

Strategic partner

Local preview
Submit every step to unlock this tab.

Client Brief

Decide which batches get full inspection each month so that fewer defective batches reach customers, at the lowest total quality cost.

Your client is a São Paulo manufacturer of plastic components for washing machines. Parts are made in batches of 2,000. Quality checks are expensive, so inspectors fully inspect a random 10% of batches. Defective batches that slip through are found by the customer and cost the client returns, sorting fees and goodwill. The quality director wants to use the machines' sensor data (temperature, pressure, cycle time) to decide which batches to inspect.

All numerical data in this case are fictional case assumptions.

Client objective

Client objective: Decide which batches get full inspection each month so that fewer defective batches reach customers, at the lowest total quality cost.

Exhibits

Exhibit 1 — Monthly quality facts

ItemValue
Batches produced1,000 a month
Batches that are defective8% (80 a month)
Cost of a defective batch reaching the customerUSD 6,000
Cost to fully inspect a batchUSD 300
Today: random inspection of 10% of batchesCatches about 10% of defective batches
Model back-test: inspect the 15% of batches the model flagsCatches about 70% of defective batches

Exhibit 2 — Options

OptionAnnual valueComplexityRisk
A. Sensor-based model chooses which batches to inspectAbout USD 3.3mMediumLow: inspectors still decide
B. Camera inspection of every part on all linesAbout USD 4.5mHigh: USD 6m capex, 12 monthsMedium: new equipment
C. Quality dashboard for supervisorsAbout USD 0.4mLowLow, but changes few decisions

Structuring 1

Build the issue tree

Break the client’s decision into clear branches, then add the drivers to investigate.

Problem Structuring criteria

  • MECE Principle 30%
  • Logical Organization 25%
  • Relevance to the Problem 20%
  • Depth of Analysis 15%
  • Prioritization of Key Drivers 10%
Main driver 1
Main driver 2

2 branches · 0 sub-drivers

Submit every step to unlock this tab.