Jakarta Renewables Public Service Improvement
Client Brief
Keep clinics running and vaccines safe during power cuts for as many patients as possible, at the lowest cost over the life of the equipment.
Your client is the Jakarta provincial health agency. Its 300 community health clinics lose grid power for about 6 hours a week. During outages, vaccine fridges warm up, doses are thrown away and some services stop. The agency has USD 4m to fix the problem and must choose between rooftop solar with batteries and diesel generators.
All numerical data in this case are fictional case assumptions.
Client objective
Client objective: Keep clinics running and vaccines safe during power cuts for as many patients as possible, at the lowest cost over the life of the equipment.
Exhibits
Exhibit 1 — Clinic facts
| Item | Value |
|---|---|
| Clinics | 300 |
| Patients served per clinic | About 1,200 a month |
| Vaccine doses thrown away after outages | About USD 1,500 per clinic a year |
| Power cuts | About 6 hours a week |
Exhibit 2 — Options per clinic
| Option | Upfront cost | Running cost | Life |
|---|---|---|---|
| Rooftop solar with battery | USD 25,000 | Negligible | 10 years |
| Diesel generator | USD 8,000 | USD 3,000 a year (fuel, maintenance) | 8 years |
Structuring 1
Build the issue tree
Break the client’s decision into clear branches, then add the drivers to investigate.
Problem Structuring criteria
- MECE Principle 30%
- Logical Organization 25%
- Relevance to the Problem 20%
- Depth of Analysis 15%
- Prioritization of Key Drivers 10%
2 branches · 0 sub-drivers
Submit every step to unlock this tab.

