Skip to content

Johannesburg Energy Analytics Strategy

Difficulty: Easy20 minutesInformation Technology

Strategic partner

Local preview
Submit every step to unlock this tab.

Client Brief

Decide which 1,200 transformers to inspect each year so that the most failures are prevented.

Your client is the electricity distribution department of a Johannesburg municipality. It runs 12,000 neighbourhood transformers (the boxes that step down voltage for streets and homes). About 600 fail each year, leaving areas without power and costing money to replace. The maintenance team can inspect and repair only 1,200 transformers a year and today picks them on a rotating schedule. An analytics team has built a model that predicts which transformers are most likely to fail.

All numerical data in this case are fictional case assumptions.

Client objective

Client objective: Decide which 1,200 transformers to inspect each year so that the most failures are prevented.

Exhibits

Exhibit 1 — Facts

ItemValue
Transformers12,000
Failures a year600
Cost of one failure (replacement, crew call-out, outage)USD 9,000
Inspections the team can do each year1,200
Share of failures prevented when an at-risk transformer is inspected and repaired70%
Today: rotating scheduleInspected transformers are a random 10% of the network
Model back-test: the 1,200 it ranks highestInclude 45% of next year's failures
Data gapLoad (how heavily each transformer is used) is missing for 30% of transformers

Structuring 1

Build the issue tree

Break the client’s decision into clear branches, then add the drivers to investigate.

Problem Structuring criteria

  • MECE Principle 30%
  • Logical Organization 25%
  • Relevance to the Problem 20%
  • Depth of Analysis 15%
  • Prioritization of Key Drivers 10%
Main driver 1
Main driver 2

2 branches · 0 sub-drivers

Submit every step to unlock this tab.