Skip to content

Amsterdam Pharmaceuticals Supply Chain Resilience

Difficulty: Hard20 minutesSupply Chain & Logistics

Strategic partner

Local preview
Submit every step to unlock this tab.

Client Brief

Determine whether the resilience program should be implemented and define the conditions for scaling it.

A pharmaceutical company in Amsterdam relies heavily on a single active-pharmaceutical-ingredient supplier for a high-volume medicine. Disruptions have caused shortages, emergency freight, and lost sales. Management is considering dual sourcing plus additional safety stock.

All numerical data in this original case are fictional case assumptions.

Client objective

Determine whether the resilience program should be implemented and define the conditions for scaling it.

Case assumption: The proposed 35% secondary-supplier share is reallocated from the current primary supplier volume; the existing 20% sourced from other suppliers is unchanged.

Exhibits

Current supply chain

All numerical data in this original case are fictional case assumptions.

MetricCurrent state
Annual medicine demand2.4m packs
Share sourced from primary supplier80%
Annual packs lost due to shortages120,000
Contribution margin per packUSD 14
Annual emergency freight / expediting costUSD 0.90m
Current service level93%
Management service-level target≥ 97%

Proposed resilience program

All numerical data in this original case are fictional case assumptions.

Program effectEstimate
Secondary supplier share35% of annual volume
Secondary supplier price premiumUSD 0.50 / pack
Expected reduction in shortage-related lost sales70%
Expected reduction in emergency logistics cost60%
Additional annual safety-stock carrying costUSD 0.35m
One-time implementation / qualification costUSD 0.80m
Expected service level98%
Key implementation riskSecondary supplier must pass pharmaceutical quality qualification

QUESTION 1 OF 6

How would you structure the decision on the pharmaceutical resilience programme? Identify and prioritize the analyses needed to advise management, and explain why they matter.

Build the issue tree

Break the client’s decision into clear branches, then add the drivers to investigate.

Problem Structuring criteria

  • MECE Principle 30%
  • Logical Organization 25%
  • Relevance to the Problem 20%
  • Depth of Analysis 15%
  • Prioritization of Key Drivers 10%
Main driver 1
Main driver 2

2 branches · 0 sub-drivers

Submit every step to unlock this tab.