Johannesburg Energy Supply Chain Resilience
Client Brief
Assess the current contribution, quantify an upside and downside volume scenario, and decide whether to test the dual-sourcing pilot.
Your client is a Johannesburg solar-equipment wholesaler. Management is evaluating a dual-sourcing pilot for its inverter units shipped. The decision is whether a measured pilot could improve annual contribution without compromising service quality. The figures below are fictional case assumptions, not reported company results.
All numerical data in this case are fictional case assumptions.
Client objective
Client objective: Assess the current contribution, quantify an upside and downside volume scenario, and decide whether to test the dual-sourcing pilot.
Exhibits
Exhibit 1 — Annual baseline and planning scenarios
Annual volume: 20,000 inverter units shipped. Average revenue per unit: USD 950. Avoidable cost per unit: USD 720. Assume the unit margin remains constant across the two scenarios and that there are no additional fixed costs in these calculations. Upside scenario: volume rises 12% following a successful pilot. Downside scenario: volume falls 7% if adoption disappoints. These are scenarios, NOT observed pilot results or forecasts. Execution gate: confirm supplier concentration and warranty quality. Pilot cost, incremental fixed cost and cash-flow timing have not been provided; a full investment return or payback cannot be calculated.
| Case information |
|---|
Structuring
Build the issue tree
Break the client’s decision into clear branches, then add the drivers to investigate.
Problem Structuring criteria
- MECE Principle 30%
- Logical Organization 25%
- Relevance to the Problem 20%
- Depth of Analysis 15%
- Prioritization of Key Drivers 10%
2 branches · 0 sub-drivers
Submit every step to unlock this tab.

